Shkoda Felitsija
+ Cars of mark Skoda Felicia
+ The maintenance instruction
+ Routine maintenance
- Engine repair
+ Repair without extraction from the car of the petrol engine of 1.3 l
+ Repair without extraction from the car of the petrol engine of 1.6 l
+ Repair without extraction from the car of the diesel engine
- Dismantle of the power unit and engine major repairs
Removal from the car of the power unit - preparation and safety measures, the general data on a suspension bracket of the power unit
Removal, partition and installation of the power unit
Engine major repairs - preliminary data
Dismantling, clearing, check of a condition and assemblage of a head of cylinders
Removal, check of a condition and installation of a camshaft and pushers of valves (the engine 1.3)
Removal and installation of an intermediate shaft (the diesel engine)
Removal, check of a condition and installation of shatunno-piston assemblages
Removal and check of a condition of a cranked shaft
Cleaning and check of a condition of the block of cylinders/kartera of the engine
Check of a condition and selection of loose leaves radical and шатунных bearings of a cranked shaft
Assembly order of the engine after major repairs performance
Installation of a cranked shaft and check of working backlashes of radical bearings
Installation of piston rings
Installation of shatunno-piston assemblages on the engine and check of working backlashes шатунных bearings
Initial start of the engine after end of its major repairs
+ Systems of cooling, heating
+ The power supply system
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body and salon furnish
+ Onboard electric equipment
|
Initial start of the engine after end of its major repairs
Operating according to the instructions stated in Section the Assembly order of the engine after performance of major repairs, establish on the engine the remained components, collect the power unit and establish it on the car (see Has undressed Removal, a partition and installation of the power unit). Carefully check up levels of a cooling liquid of impellent oil. Make sure of correctness of connection of all lines of communication. Check up an impellent compartment on presence of the materials forgotten in it and tools.
Petrol models
|
1. Remove spark plugs.
2. Make иммобилизацию the engine, having provided possibility проворачивания with its starter without start - disconnect the relay of the fuel pump (the Power supply system see the Head). Alternatively find and remove a safety lock of the fuel pump.
|
On equipped catalytic the converter models иммобилизация the engine by switching-off of system of ignition without power supply system switching-off can lead to failure of a working element of the converter at the expense of hit in it of not burnt down fuel which then will invariably ignite at normal start of the engine. |
3. Turn the engine a starter until the control lamp of pressure of oil will be disconnected. If the lamp is not disconnected after some seconds проворачивания the engine, once again check up level of oil and reliability of fastening of the oil filter. If everything is all right, check up a condition of electroconducting of the gauge-switch of pressure of oil. It is not necessary to continue attempts until will be assured that oil regularly circulates on the engine.
4. Screw to the place of a spark plug and connect the power supply system. |
|
Diesel models
|
1. Disconnect electroconducting from запорного the valve on ТНВД (the Power supply system see the Head).
2. Turning the engine a starter, achieve switching-off of a control lamp of pressure of oil.
3. If the lamp is not disconnected after some seconds проворачивания the engine, once again check up level of oil and reliability of fastening of the oil filter. If everything is all right, check up a condition of electroconducting of the gauge-switch of pressure of oil. It is not necessary to continue attempts until will be assured that oil regularly circulates on the engine.
4. Connect electroconducting to запорному to the valve. |
|
All models
|
1. Start the engine - procedure can occupy slightly more time, than usually in view of necessity of filling of a path of the power supply system.
2. Having left the engine working on single turns, check up it on presence of signs of leaks of a cooling liquid, oil and fuel. It is not necessary to panic at occurrence of a smell of burning and smoke occurrence is there is a burning out of the greasings used at assemblage.
3. On petrol modules insignificant infringement of stability of turns of idling before recall ECU of necessary parametres for what some time is required can take place.
4. On diesel models and l models 1.6 hydraulic pushers at first can work with the raised level of noise, however after some seconds the background should settle into shape.
5. If everything is all right, wait warming up of the top hose of a radiator, then muffle the engine.
6. On diesel models check up installation of phases timing ТНВД and idling turns.
7. Allow to the engine to cool down within several minutes, then make checks of levels of oil and cooling liquid. In case of need make corresponding updatings.
8. On all models there is no necessity for pulling up of fixture of a head of cylinders.
9. If replacement of pistons, piston rings or bearings of a cranked shaft has been made, it is necessary to make обкатку the engine as though about was new. I.e. throughout the first 1000 km (600 miles) run should be avoided full opening throttle заслонки, to try not to move накатом and with small turns of the engine. It is recommended also upon termination of обкатки to replace impellent oil and the oil filter. |
|
|
|